COMMENT āŠ—   VALID 00032 PAGES
C REC  PAGE   DESCRIPTION
C00001 00001
C00004 00002	GRANT STATUS for ARPA-80 at the end of 12/79
C00006 00003	PROJECTION for ARPA-80 for the month 01/80
C00009 00004	PROJECTION for ARPA-80 for the month 02/80
C00012 00005	PROJECTION for ARPA-80 for the month 03/80
C00015 00006	PROJECTION for ARPA-80 for the month 04/80
C00018 00007	PROJECTION for ARPA-80 for the month 05/80
C00021 00008	PROJECTION for ARPA-80 for the month 06/80
C00024 00009	PROJECTION for ARPA-80 for the month 07/80
C00027 00010	PROJECTION for ARPA-80 for the month 08/80
C00030 00011	PROJECTION for ARPA-80 for the month 09/80
C00033 00012	PROJECTION for ARPA-80 for the month 10/80
C00036 00013	PROJECTION for ARPA-80 for the month 11/80
C00039 00014	PROJECTION for ARPA-80 for the month 12/80
C00042 00015	PROJECTION for ARPA-80 for the month 01/81
C00045 00016	PROJECTION for ARPA-80 for the month 02/81
C00048 00017	PROJECTION for ARPA-80 for the month 03/81
C00051 00018	PROJECTION for ARPA-80 for the month 04/81
C00054 00019	PROJECTION for ARPA-80 for the month 05/81
C00057 00020	PROJECTION for ARPA-80 for the month 06/81
C00060 00021	PROJECTION for ARPA-80 for the month 07/81
C00063 00022	PROJECTION for ARPA-80 for the month 08/81
C00066 00023	PROJECTION for ARPA-80 for the month 09/81
C00069 00024	PROJECTION for ARPA-80 for the month 10/81
C00072 00025	PROJECTION for ARPA-80 for the month 11/81
C00075 00026	PROJECTION for ARPA-80 for the month 12/81
C00078 00027	Summary of BINFORD on ARPA-80 from 01/80 thru 12/81
C00081 00028	Summary of ARNOLD on ARPA-80 from 01/80 thru 12/81
C00084 00029	Summary of BROOKS on ARPA-80 from 01/80 thru 12/81
C00087 00030	Summary of CLARKSON on ARPA-80 from 01/80 thru 12/81
C00090 00031	Summary of GENNERY on ARPA-80 from 01/80 thru 12/81
C00091 00032	Summary of MILLER on ARPA-80 from 01/80 thru 12/81
C00094 ENDMK
CāŠ—;
GRANT STATUS for ARPA-80 at the end of 12/79
                                     To Date   Budgeted  Remaining
                                     -------   --------  ---------
SALARIES AND WAGES                      0.00  115703.00  115703.00

STAFF BENEFITS                          0.00       0.00       0.00

CAPITAL EXPENDITURES                    0.00       0.00       0.00

TRAVEL                                  0.00    8900.00    8900.00

EXPENDABLE MATERIALS                    0.00       0.00       0.00

INDIRECT COSTS                          0.00       0.00       0.00

TOTAL                                   0.00  124603.00  124603.00
PROJECTION for ARPA-80 for the month 01/80

Prepared by BIS using BUDGET on 05/30/80 at 18:57:57

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    0  % of    2736.00          0.00 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             2396.50    2396.50  115703.00  113306.50


STAFF BENEFITS at 0.192               460.12     460.12       0.00     460.12-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               1656.84    1656.84       0.00    1656.84-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          4513.47    4513.47  124603.00  120089.52
PROJECTION for ARPA-80 for the month 02/80

Prepared by BIS using BUDGET on 05/30/80 at 18:57:57

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    46 % of    2736.00       1281.08 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             3677.58    6074.08  115703.00  109628.91


STAFF BENEFITS at 0.192               706.09    1166.22       0.00    1166.22-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2542.53    4199.37       0.00    4199.37-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6926.21   11439.68  124603.00  113163.31
PROJECTION for ARPA-80 for the month 03/80

Prepared by BIS using BUDGET on 05/30/80 at 18:57:58

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             3709.78    9783.86  115703.00  105919.13


STAFF BENEFITS at 0.192               712.27    1878.50       0.00    1878.50-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2564.79    6764.17       0.00    6764.17-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6986.85   18426.53  124603.00  106176.46
PROJECTION for ARPA-80 for the month 04/80

Prepared by BIS using BUDGET on 05/30/80 at 18:57:58

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             3709.78   13493.64  115703.00  102209.35


STAFF BENEFITS at 0.192               712.27    2590.77       0.00    2590.77-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2564.79    9328.96       0.00    9328.96-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6986.85   25413.38  124603.00   99189.61
PROJECTION for ARPA-80 for the month 05/80

Prepared by BIS using BUDGET on 05/30/80 at 18:57:59

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             3709.78   17203.42  115703.00   98499.57


STAFF BENEFITS at 0.192               712.27    3303.05       0.00    3303.05-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2564.79   11893.75       0.00   11893.75-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6986.85   32400.24  124603.00   92202.76
PROJECTION for ARPA-80 for the month 06/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:00

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     50 % of    1074.00        537.00 
 BROOKS     50 % of    1074.00        537.00 
 CLARKSON   25 % of     994.00        248.50 
 GENNERY    50 % of    1074.00        537.00 
 MILLER     50 % of    1074.00        537.00 
                                  ----------
TOTAL SALARIES AND WAGES             3709.78   20913.20  115703.00   94789.79


STAFF BENEFITS at 0.192               712.27    4015.33       0.00    4015.33-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2564.79   14458.55       0.00   14458.55-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6986.85   39387.09  124603.00   85215.90
PROJECTION for ARPA-80 for the month 07/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:00

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     100% of    1074.00       1074.00 
 BROOKS     100% of    1074.00       1074.00 
 CLARKSON   100% of     994.00        994.00 
                                  ----------
TOTAL SALARIES AND WAGES             4455.28   25368.48  115703.00   90334.51


STAFF BENEFITS at 0.192               855.41    4870.74       0.00    4870.74-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               3080.20   17538.75       0.00   17538.75-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          8390.89   47777.98  124603.00   76825.01
PROJECTION for ARPA-80 for the month 08/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:01

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    2736.00       1313.28 
 ARNOLD     100% of    1074.00       1074.00 
 BROOKS     100% of    1074.00       1074.00 
 CLARKSON   100% of     994.00        994.00 
                                  ----------
TOTAL SALARIES AND WAGES             4455.28   29823.76  115703.00   85879.23


STAFF BENEFITS at 0.192               855.41    5726.16       0.00    5726.16-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               3080.20   20618.95       0.00   20618.95-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          8390.89   56168.88  124603.00   68434.11
PROJECTION for ARPA-80 for the month 09/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:02

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     100% of    1074.00       1074.00 
 BROOKS     100% of    1074.00       1074.00 
 CLARKSON   100% of     994.00        994.00 
                                  ----------
TOTAL SALARIES AND WAGES             4586.60   34410.37  115703.00   81292.62


STAFF BENEFITS at 0.21                963.18    6689.35       0.00    6689.35-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               3218.88   23837.83       0.00   23837.83-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          8768.67   64937.56  124603.00   59665.43
PROJECTION for ARPA-80 for the month 10/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:02

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   37958.47  115703.00   77744.52


STAFF BENEFITS at 0.21                745.10    7434.45       0.00    7434.45-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   26327.90       0.00   26327.90-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27   71720.83  124603.00   52882.16
PROJECTION for ARPA-80 for the month 11/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:03

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   41506.58  115703.00   74196.41


STAFF BENEFITS at 0.21                745.10    8179.55       0.00    8179.55-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   28817.96       0.00   28817.96-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27   78504.10  124603.00   46098.89
PROJECTION for ARPA-80 for the month 12/80

Prepared by BIS using BUDGET on 05/30/80 at 18:58:03

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   45054.69  115703.00   70648.30


STAFF BENEFITS at 0.21                745.10    8924.65       0.00    8924.65-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   31308.02       0.00   31308.02-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27   85287.37  124603.00   39315.62
PROJECTION for ARPA-80 for the month 01/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:04

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   48602.80  115703.00   67100.19


STAFF BENEFITS at 0.21                745.10    9669.76       0.00    9669.76-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   33798.08       0.00   33798.08-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27   92070.65  124603.00   32532.34
PROJECTION for ARPA-80 for the month 02/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:04

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   52150.91  115703.00   63552.08


STAFF BENEFITS at 0.21                745.10   10414.86       0.00   10414.86-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   36288.15       0.00   36288.15-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27   98853.92  124603.00   25749.07
PROJECTION for ARPA-80 for the month 03/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:05

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   55699.01  115703.00   60003.98


STAFF BENEFITS at 0.21                745.10   11159.96       0.00   11159.96-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   38778.21       0.00   38778.21-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27  105637.19  124603.00   18965.80
PROJECTION for ARPA-80 for the month 04/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:05

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   59247.12  115703.00   56455.87


STAFF BENEFITS at 0.21                745.10   11905.06       0.00   11905.06-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   41268.27       0.00   41268.27-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27  112420.47  124603.00   12182.52
PROJECTION for ARPA-80 for the month 05/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:06

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   62795.23  115703.00   52907.76


STAFF BENEFITS at 0.21                745.10   12650.17       0.00   12650.17-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   43758.33       0.00   43758.33-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27  119203.74  124603.00    5399.25
PROJECTION for ARPA-80 for the month 06/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:07

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     50 % of    1202.00        601.00 
 BROOKS     50 % of    1202.00        601.00 
 CLARKSON   25 % of    1202.00        300.50 
 MILLER     50 % of    1202.00        601.00 
                                  ----------
TOTAL SALARIES AND WAGES             3548.10   66343.34  115703.00   49359.65


STAFF BENEFITS at 0.21                745.10   13395.27       0.00   13395.27-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2490.06   46248.39       0.00   46248.39-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          6783.27  125987.01  124603.00    1384.01-
PROJECTION for ARPA-80 for the month 07/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:08

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     100% of    1202.00       1202.00 
 BROOKS     100% of    1202.00       1202.00 
 CLARKSON   100% of    1202.00       1202.00 
 MILLER     100% of    1202.00       1202.00 
                                  ----------
TOTAL SALARIES AND WAGES             6252.60   72595.95  115703.00   43107.04


STAFF BENEFITS at 0.21               1313.04   14708.32       0.00   14708.32-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               4388.08   50636.47       0.00   50636.47-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         11953.73  137940.75  124603.00   13337.75-
PROJECTION for ARPA-80 for the month 08/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:08

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3009.59       1444.60 
 ARNOLD     100% of    1202.00       1202.00 
 BROOKS     100% of    1202.00       1202.00 
 CLARKSON   100% of    1202.00       1202.00 
 MILLER     100% of    1202.00       1202.00 
                                  ----------
TOTAL SALARIES AND WAGES             6252.60   78848.56  115703.00   36854.44


STAFF BENEFITS at 0.21               1313.04   16021.36       0.00   16021.36-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               4388.08   55024.55       0.00   55024.55-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         11953.73  149894.48  124603.00   25291.48-
PROJECTION for ARPA-80 for the month 09/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:09

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3310.55       1589.06 
 ARNOLD     100% of    1202.00       1202.00 
 BROOKS     100% of    1202.00       1202.00 
 CLARKSON   100% of    1202.00       1202.00 
 MILLER     100% of    1202.00       1202.00 
                                  ----------
TOTAL SALARIES AND WAGES             6397.06   85245.62  115703.00   30457.37


STAFF BENEFITS at 0.216              1381.76   17403.13       0.00   17403.13-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               4511.72   59536.28       0.00   59536.28-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                         12290.56  162185.04  124603.00   37582.04-
PROJECTION for ARPA-80 for the month 10/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:09

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3310.55       1589.06 
 ARNOLD     50 % of    1322.20        661.10 
 BROOKS     50 % of    1322.20        661.10 
 CLARKSON   25 % of    1322.20        330.55 
 MILLER     50 % of    1322.20        661.10 
                                  ----------
TOTAL SALARIES AND WAGES             3902.91   89148.54  115703.00   26554.45


STAFF BENEFITS at 0.216               843.03   18246.16       0.00   18246.16-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2752.65   62288.93       0.00   62288.93-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          7498.59  169683.64  124603.00   45080.64-
PROJECTION for ARPA-80 for the month 11/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:10

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3310.55       1589.06 
 ARNOLD     50 % of    1322.20        661.10 
 BROOKS     50 % of    1322.20        661.10 
 CLARKSON   25 % of    1322.20        330.55 
 MILLER     50 % of    1322.20        661.10 
                                  ----------
TOTAL SALARIES AND WAGES             3902.91   93051.46  115703.00   22651.53


STAFF BENEFITS at 0.216               843.03   19089.19       0.00   19089.19-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2752.65   65041.58       0.00   65041.58-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          7498.59  177182.24  124603.00   52579.24-
PROJECTION for ARPA-80 for the month 12/81

Prepared by BIS using BUDGET on 05/30/80 at 18:58:10

                                  This Month    To Date   Budgeted  Remaining
                                  ----------    -------   --------  ---------

SALARIES AND WAGES
 BINFORD    48 % of    3310.55       1589.06 
 ARNOLD     50 % of    1322.20        661.10 
 BROOKS     50 % of    1322.20        661.10 
 CLARKSON   25 % of    1322.20        330.55 
 MILLER     50 % of    1322.20        661.10 
                                  ----------
TOTAL SALARIES AND WAGES             3902.91   96954.38  115703.00   18748.61


STAFF BENEFITS at 0.216               843.03   19932.22       0.00   19932.22-


CAPITAL EXPENDITURES
                                  ----------
TOTAL FOR CAPITAL EXPENDITURES          0.00       0.00       0.00       0.00


TRAVEL
                                  ----------
TOTAL FOR TRAVEL                        0.00       0.00    8900.00    8900.00


EXPENDABLE MATERIALS
                                  ----------
TOTAL FOR EXPENDABLE MATERIALS          0.00       0.00       0.00       0.00


INDIRECT COSTS at 0.58               2752.65   67794.23       0.00   67794.23-

                                  ----------  ---------  ---------  ---------
TOTAL COSTS                          7498.59  184680.85  124603.00   60077.84-
Summary of BINFORD on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   0  % of    2736.00          0.00          0.00 
02/80   46 % of    2736.00       1281.08       1281.08 
03/80   48 % of    2736.00       1313.28       2594.36 
04/80   48 % of    2736.00       1313.28       3907.64 
05/80   48 % of    2736.00       1313.28       5220.92 
06/80   48 % of    2736.00       1313.28       6534.20 
07/80   48 % of    2736.00       1313.28       7847.48 
08/80   48 % of    2736.00       1313.28       9160.76 
09/80   48 % of    3009.59       1444.60      10605.37 
10/80   48 % of    3009.59       1444.60      12049.97 
11/80   48 % of    3009.59       1444.60      13494.58 
12/80   48 % of    3009.59       1444.60      14939.19 
01/81   48 % of    3009.59       1444.60      16383.80 
02/81   48 % of    3009.59       1444.60      17828.41 
03/81   48 % of    3009.59       1444.60      19273.01 
04/81   48 % of    3009.59       1444.60      20717.62 
05/81   48 % of    3009.59       1444.60      22162.23 
06/81   48 % of    3009.59       1444.60      23606.84 
07/81   48 % of    3009.59       1444.60      25051.45 
08/81   48 % of    3009.59       1444.60      26496.05 
09/81   48 % of    3310.55       1589.06      28085.12 
10/81   48 % of    3310.55       1589.06      29674.19 
11/81   48 % of    3310.55       1589.06      31263.26 
12/81   48 % of    3310.55       1589.06      32852.33 
Summary of ARNOLD on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   50 % of    1074.00        537.00        537.00 
02/80   50 % of    1074.00        537.00       1074.00 
03/80   50 % of    1074.00        537.00       1611.00 
04/80   50 % of    1074.00        537.00       2148.00 
05/80   50 % of    1074.00        537.00       2685.00 
06/80   50 % of    1074.00        537.00       3222.00 
07/80   100% of    1074.00       1074.00       4296.00 
08/80   100% of    1074.00       1074.00       5370.00 
09/80   100% of    1074.00       1074.00       6444.00 
10/80   50 % of    1202.00        601.00       7045.00 
11/80   50 % of    1202.00        601.00       7646.00 
12/80   50 % of    1202.00        601.00       8247.00 
01/81   50 % of    1202.00        601.00       8848.00 
02/81   50 % of    1202.00        601.00       9449.00 
03/81   50 % of    1202.00        601.00      10050.00 
04/81   50 % of    1202.00        601.00      10651.00 
05/81   50 % of    1202.00        601.00      11252.00 
06/81   50 % of    1202.00        601.00      11853.00 
07/81   100% of    1202.00       1202.00      13055.00 
08/81   100% of    1202.00       1202.00      14257.00 
09/81   100% of    1202.00       1202.00      15459.00 
10/81   50 % of    1322.20        661.10      16120.10 
11/81   50 % of    1322.20        661.10      16781.20 
12/81   50 % of    1322.20        661.10      17442.30 
Summary of BROOKS on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   50 % of    1074.00        537.00        537.00 
02/80   50 % of    1074.00        537.00       1074.00 
03/80   50 % of    1074.00        537.00       1611.00 
04/80   50 % of    1074.00        537.00       2148.00 
05/80   50 % of    1074.00        537.00       2685.00 
06/80   50 % of    1074.00        537.00       3222.00 
07/80   100% of    1074.00       1074.00       4296.00 
08/80   100% of    1074.00       1074.00       5370.00 
09/80   100% of    1074.00       1074.00       6444.00 
10/80   50 % of    1202.00        601.00       7045.00 
11/80   50 % of    1202.00        601.00       7646.00 
12/80   50 % of    1202.00        601.00       8247.00 
01/81   50 % of    1202.00        601.00       8848.00 
02/81   50 % of    1202.00        601.00       9449.00 
03/81   50 % of    1202.00        601.00      10050.00 
04/81   50 % of    1202.00        601.00      10651.00 
05/81   50 % of    1202.00        601.00      11252.00 
06/81   50 % of    1202.00        601.00      11853.00 
07/81   100% of    1202.00       1202.00      13055.00 
08/81   100% of    1202.00       1202.00      14257.00 
09/81   100% of    1202.00       1202.00      15459.00 
10/81   50 % of    1322.20        661.10      16120.10 
11/81   50 % of    1322.20        661.10      16781.20 
12/81   50 % of    1322.20        661.10      17442.30 
Summary of CLARKSON on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   25 % of     994.00        248.50        248.50 
02/80   25 % of     994.00        248.50        497.00 
03/80   25 % of     994.00        248.50        745.50 
04/80   25 % of     994.00        248.50        994.00 
05/80   25 % of     994.00        248.50       1242.50 
06/80   25 % of     994.00        248.50       1491.00 
07/80   100% of     994.00        994.00       2485.00 
08/80   100% of     994.00        994.00       3479.00 
09/80   100% of     994.00        994.00       4473.00 
10/80   25 % of    1202.00        300.50       4773.50 
11/80   25 % of    1202.00        300.50       5074.00 
12/80   25 % of    1202.00        300.50       5374.50 
01/81   25 % of    1202.00        300.50       5675.00 
02/81   25 % of    1202.00        300.50       5975.50 
03/81   25 % of    1202.00        300.50       6276.00 
04/81   25 % of    1202.00        300.50       6576.50 
05/81   25 % of    1202.00        300.50       6877.00 
06/81   25 % of    1202.00        300.50       7177.50 
07/81   100% of    1202.00       1202.00       8379.50 
08/81   100% of    1202.00       1202.00       9581.50 
09/81   100% of    1202.00       1202.00      10783.50 
10/81   25 % of    1322.20        330.55      11114.05 
11/81   25 % of    1322.20        330.55      11444.60 
12/81   25 % of    1322.20        330.55      11775.15 
Summary of GENNERY on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   50 % of    1074.00        537.00        537.00 
02/80   50 % of    1074.00        537.00       1074.00 
03/80   50 % of    1074.00        537.00       1611.00 
04/80   50 % of    1074.00        537.00       2148.00 
05/80   50 % of    1074.00        537.00       2685.00 
06/80   50 % of    1074.00        537.00       3222.00 
07/80
08/80
09/80
10/80
11/80
12/80
01/81
02/81
03/81
04/81
05/81
06/81
07/81
08/81
09/81
10/81
11/81
12/81
Summary of MILLER on ARPA-80 from 01/80 thru 12/81

month               salary     this month      to-date
-----               ------     ----------      -------

01/80   50 % of    1074.00        537.00        537.00 
02/80   50 % of    1074.00        537.00       1074.00 
03/80   50 % of    1074.00        537.00       1611.00 
04/80   50 % of    1074.00        537.00       2148.00 
05/80   50 % of    1074.00        537.00       2685.00 
06/80   50 % of    1074.00        537.00       3222.00 
07/80
08/80
09/80
10/80   50 % of    1202.00        601.00       3823.00 
11/80   50 % of    1202.00        601.00       4424.00 
12/80   50 % of    1202.00        601.00       5025.00 
01/81   50 % of    1202.00        601.00       5626.00 
02/81   50 % of    1202.00        601.00       6227.00 
03/81   50 % of    1202.00        601.00       6828.00 
04/81   50 % of    1202.00        601.00       7429.00 
05/81   50 % of    1202.00        601.00       8030.00 
06/81   50 % of    1202.00        601.00       8631.00 
07/81   100% of    1202.00       1202.00       9833.00 
08/81   100% of    1202.00       1202.00      11035.00 
09/81   100% of    1202.00       1202.00      12237.00 
10/81   50 % of    1322.20        661.10      12898.10 
11/81   50 % of    1322.20        661.10      13559.20 
12/81   50 % of    1322.20        661.10      14220.29